Approved by the decision of Baranovichi city executive committee 06.09.2013 №2359.
Changes made by the decisions of Baranovichi city executive committee 11.10.2013 №2735, 18.02.2014 №399, 21.03.2014 №794, 20.05.2014 №1375, 04.08.2014 №2132, 17.06.2014 №1675, 07.07.2014 г. №1853, 05.09.2014 №2519, 19.01.2015 №129, 01.06.2015 №1569, 23.05.2016 №1347, от 26 мая 2017 г. № 1609.
List of plots for investment projects
No. | Location | Approximate land plot area, ha | Possible ways of use | Infrastructure | Public authotiry(state organization)one should applyfor signing an investment agreementwith the Republic of Belarus |
Baranovichi town | |||||
1 |
Voikova-Timiryazeva-Sverdlova str. |
2.5 | construction of a multifunctional entertaining center (current low-rise accommodations and administrative buildings are subject to removal; planting area is not less than 25% of the territory) | there is an electricity line (Voikova and Sverdlova streets), 3 power lines on the plot; water pipeline ø150 mm (along Voikova str.), water pipelines ø150 mm and ø400 mm (along the Smolenskaya str.), water pipeline ø100 mm (along the Timiriazeva str.); sewer system ø1000 mm and ø500 mm (along the Baranova str.); low pressure gas pipelineа ø114 mm (along the Timiriazeva str.); driveway | Brest regional Executive Committee (Brest, Lenin str, 11) |
2 |
Sovetskiy ave. |
0.5 | culture and entertaining center (number of stories - up to 3, planting area is not less than 25%) | sewer system ø300 mm and water pipelines ø800 mm (along the Sovetskogo ave.), low pressure gas pipeline ø108 mm at a distance of 200 m; cabel power line - eastern side of the plot. driveway | Brest regional Executive Committee (Brest, Lenin str, 11) |
3 |
Sovetskiy ave. |
1.5 (building line is to be 5 m from the red line of Sovetskogo ave.) | construction of a multifunctional building for a business center (current low-rise accommodations are subject to removal) | sewer system ø200 mm, water pipeline ø20 mm, low pressure gas pipeline ø50 mm and ø114 mm; low pressure (ø100 mm) and medium pressure (ø500) mm gas pipelines (along the Shevchenko str.); driveway | Brest regional Executive Committee (Brest, Lenin str, 11) |
4 |
Sovetskiy ave. |
1.15 (1 of which - for site development) | construction of a multifunctional complex (hotel complex, block of flats, administrative & shopping facilities (accommodations of little value are subject to removal with settling of citizens in accordance with the established by applicable legislation procedure, reconstruction of infrastructure) | electricity line and low pressure gas pipeline ø114 mm (along the Dubrovskogo lane); driveway | Brest regional Executive Committee (Brest, Lenin str, 11) |
5 |
Sovetskaya-Mickevicha-Gagarina str. |
0.65 | construction of elite housing, a shopping center, a hotel, public catering facilities (a bar, restaurant, café); current accommodations and accessory buildings removal | electricity lines and low pressure gas pipeline ø100 mm; low pressure gas pipelines ø89 mm (along the Gagarina str.); pipeline ø150 mm (along the Sovetskaya, gagarina and Mitskevicha streets); sewer system ø150 mm (along the Mitskevicha str,), ø200 mm (along the Gagarina str.); driveway | Brest regional Executive Committee (Brest, Lenin str, 11) |
6 |
41, F.Skoriny str. |
4,0 |
construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) |
Construction of electric, water lines (2 km long along F.Scoriny str. from waterpipeline ø200 mm on Professionalnaya str. to ø150 water pipeline on 295, Brestskaya str.) is needed. Connection to sewerage system is needed as well as construction of collectors 1,4 km long. |
Brest regional Executive Committee |
7 |
315, Brestskaya str. |
7,1 |
construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) |
Construction of electric, water lines (2 km long along F.Scoriny str. from waterpipeline ø200 mm on Professionalnaya str. to ø150 water pipeline on 295, Brestskaya str.) is needed. Connection to sewerage system is needed as well as construction of collectors 1,4 km long. |
Brest regional Executive Committee |
8 |
Fabrichnaya str. |
5,3 |
construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) |
Concurrence of electric connection is needed. A section of water pipeline 470 m long should be constructed along Gaevoj str. to the water pipeline ø 200 mm on Masherov aven. (about 470 m away from ythe plot). A section of sewerage system about 700 m long should be projected & built from the plot to the collector ø200 mm on Gaevaya str. (700 m away from the plot).} |
Brest regional Executive Committee |
9 |
7, Zelenaja str. |
0,37 |
construction of a building (2-4 storied hotel); plots are sudject to seizure in accordance with established order with the removal of individual appartments in 5 & 9 Zelenaja str. |
Building of a 10/0.4 kW transformer substation is needed with laying of 10 kW cable lines & carrying out the electricity network from under the spot of construction. Low pressure (0.003 MPa) ø89 mm gas pipeline goes along the plot, low pressure (0.003 MPa) ø57 mm gas pipeline goes through the ploton. Not far from the plot there is a ø150 mm water line & a ø150 mm sewege line? which is in the the books of individual developer entity. The plot can be accessed by the existing driveway. |
Brest regional Executive Committee (Brest, Lenin str, 11) |
10 |
Professionalhaja str. |
3,0 |
Brest regional Executive Committee (Brest, Lenin str, 11) |
||
11 |
Dubovo district |
3,2 |
Brest regional Executive Committee (Brest, Lenin str, 11) |
||
12 |
184E, Vilchkovskogo str. |
5,0 |
Brest regional Executive Committee (Brest, Lenin str, 11) |
||
13 |
Kirova str. |
0,1 |
|
|
Brest regional Executive Committee |
14 |
Viliamsa str. |
0,1 |
|
|
Brest regional Executive Committee |
15 |
19V, Fabrichnaya str. |
0,5430 |
Brest regional Executive Committee |